Pellet biomass cogeneration plants “E3” and “WE-50P” were installed. The heat from both biomass cogeneration plants (180 kW in total) is used in cascade for water heating, air conditioning, floor heating and street heating in the complex
Reduce carbon footprint and generate electricity and heat for the hotel and on-site spa.
Pellet biomass cogeneration plants “E3” and “WE-50P” were installed. The heat from both biomass cogeneration plants (180 kW in total) is used in cascade for water heating, air conditioning, floor heating and street heating in the complex
Since 2023, WegscheidEntrenco has stood for teamwork — and for double the energy.
With doubled know-how, our experience and our passion for innovation, together we are driving an independent, cost-effective and sustainable energy supply based on biomass even more effectively.
This plant was manufactured and installed by ENTRENCO GmbH in 2002.
Running pellet-biomass power plant since 2002
E3: 25 kWel. for own system
WE-50P: 49,9 kWel. for FIT- system (feed-in tariff)
supplies 180 kWth
Contact us now free of charge and without commitment. With a short information about your needs, the location of your company and what your expectations are, we can advise you on how a biomass CHP system can be used in your company.
Contact us